18/Feb/23:
Going back to some normality.
No indoor meeting just yet.
Cooling Sys, H.C. ET
Annual serv., H.C.BD
Eng Refresh, Oil Pan. HM
Centre console, Cooling. RL1 Eng Refresh, Cooling Sys. RL2
H.C., Upper molding. NA CL service, R pedal. DF
Eng Refresh, Cooling. PP H.C., etc TBD AH Drive shaft. GH Eng Refresh. SO Eng Refresh. IB Eng Refresh. GH
H.C., etc. CN DR shaft, Cooling Sys SD Eng Refresh. NA