Both joints were cleaned and inspected so ready for the rebuilt process.
Outboard joint being filled with the new grease.
Rollers installed in their original positions and moved onto the inboard joint.
So, something looked like this is now refurbished to this level.
In the process of putting everything back in place.
Left drive shaft installed.
Filled with MTF3 and letting the excess oil draining from the filler hole.
Ready to tighten the suspension bolts and nuts under 1G to prevent twisting the rubber bushes.
Hoping to test drive this NSX tomorrow but weather forecast was not great.
I hope the rain and the wind are not too bad…