View RSS Feed

Today at Atelier Kaz - Private NSX Enthusiast, ex-Honda R&D engineer with F1, Indy/CART background

Eng Refresh Stage 2 – 15

Rate this Entry






New oil filter filled with Mobil 1 on installation.








Rear brake line back in place.








Bottom side completed.
Just need to torque the damper mounting bolt and
anti-roll bar bracket under 1G.



As always, just lots and lots of wrenching under limited space on LEV models.









Upper side ready for cranking the engine.



Started to fill the engine oil using the big funnel and while doing so,
tried to look for the coolant vacuum feed gauge behind me.
Of course, when you twist the body, it will also move your arm and
I managed to pour some oil onto
the V-bank side of the front valve cover.

School boy error and I was not happy with myself after
spending hours cleaning the engine at the beginning of the service.

Although it was already dressed,
had to use plenty of brake cleaner to wash down part of
the valve cover and V-bank area again........

Will check for any oil residue tomorrow and
apply another spray of brake cleaner again........


Kaz


Comments