View RSS Feed

Today at Atelier Kaz - Private NSX Enthusiast, ex-Honda R&D engineer with F1, Indy/CART background

Eng Refresh Stage 2 – 13

Rate this Entry






New filter gaskets and the bolts for later spec VTEC Spool valve.
Must replace the bolts especially the vertical ones.









Degrease the mating surface to this level.







Rear bank one installed.






Front bank one together with Oil press sender unit installed.









Dressing this side of the engine.







Ready to go back into the engine bay.







Cleaned the engine bay.
See you again in 10 years time.







Engine back in the bay and connected to the chassis frame.







New spring loaded bolts and nuts at the CAT.
Not torqued yet as the position of the header and
tail pipe will move until the four eng/gbox mounts and
sub frame bolts are torqued in the specific sequence.



Time to remove the oil pan.
Can't wait to see the state of the buffle plate and
inside of the oil pan.
Greasy task ahead.



More to follow later.

Kaz


Updated 01-01-2013 at 02:42 PM by Kaz-kzukNA1 (layout change for mobile devices)

Categories
Engine Refresh Stage 2

Comments