Eng Refresh Stage 2 - 20
by
, 31-01-2012 at 10:37 PM (2388 Views)
Eng is back on the chassis.
Not much to say because it’s just the matter of lots and lots of wrenching putting everything back in place.
Just kept all four eng/trans mount and twelve rear sub frame bolts loose as I still need to remove the Front beam to re-install the A/C compressor as well as to remove the Front header to replace the oil pan gasket.
These bolts and nuts require specific tightening sequence.
Eng loom pushed back into the cabin and re-connected to the ECU as well as to the surrounding connectors.
Just keep re-installing lots of parts.
Forgot to collect the CAT gasket from my local Honda garage.
Hope to fire up the engine soon and carry out the compression check.
Kaz