TB/WP/Valve 16
by
, 18-05-2011 at 11:43 PM (2079 Views)
Putting back everything in preparation for the engine fire up to carry out the compression check after the service.
ENG Oil cooler re-installed by using liquid gasket on the upper two bolts.
No need for the liquid gasket at the lower bolt.
Crank pulley bolt cleaned and greased properly for the next TB service and torqued to the spec.