View RSS Feed

All Blog Entries

  1. A/C CCU Board service

    by , 23-03-2014 at 05:30 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)




    Although the owner was not feeling any issues on his A/C system,
    he decided to carry out the preventative measures on the CCU.
    Very good decision by acting now instead of waiting for something to fail
    as it will save the time and cost for the owner.




    The light green circuit board material with brown capacitor
    ...
  2. Eng Refresh 25

    by , 23-03-2014 at 05:20 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)




    Went out for the 1st test driving session for the general checks.

    Happy with the result so back on the lift, visual inspection,
    re-torque the wheel nut, adjust the Aux belts tension, etc and
    checked the base idle rpm.




    This is the DBW model so needs to short the 2pin Blue SCS terminal
    before
    ...
  3. Happy Birthday

    by , 21-03-2014 at 05:02 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)


    Wish you were here....
    It's been a while since last time we worked together....





    Tags: ayrton Add / Edit Tags
    Categories
    Personal View/Self Talk
  4. Recovering.....

    by , 19-03-2014 at 01:42 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)




    Hi all.
    For those who sent me email, SMS, App message, etc over the
    last few days, apology for not being able to respond to any of them.
    I was struck by the vomiting virus and couldn’t eat or even drink and
    just managed to start recovering.

    I joked in my recent blog that I’m getting old because of the
    back pain after replacing the CL master cyl but it was actually the
    first sign of the infection.
    Soon, the pain
    ...
  5. Eng Refresh 24

    by , 15-03-2014 at 01:45 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)

    Time for the compression check after the Eng Refresh.
    Full data has been sent to the owner.

    [psi]
    #1: **1 #2: **6 #3: **9
    #4: **5 #5: **7 #6: **0

    Really happy with the result and paid off for spending hours
    adjusting the valve clearance as well as carefully installing
    each parts and tensioning the TB.
    ...