TB tensioned properly and adjuster bolt torqued to the spec. New TB lower cover ...
This side of the engine is nearly done. Time to finish the intake manifold. The 90deg swaging of the VVIS plate screw against the shaft. ...
Updated 17-09-2013 at 11:51 AM by Kaz-kzukNA1
Cleaned the remaining of the EGR gasket. I’m so glad that I can replace this heavily corroded water passage. ...
The old crank pulley bolt and the key served more than 17yrs now and although they were still fine, I think I will replace them with new ones this time. So ...
Updated 01-06-2012 at 10:40 PM by Kaz-kzukNA1
On going project of cleaning the engine…. EGR valve cleaned. Didn’t want to disturb the spindle so only briefly cleaned around it and cleaned the port while opening the valve manually. The EGR tube and small chamber were also soaked in special cleaning solution and ready for the reassembly. ...
Updated 01-06-2012 at 10:18 PM by Kaz-kzukNA1