View RSS Feed

All Blog Entries

  1. Eng Refresh Stage 1 - 16

    by , 23-03-2012 at 10:58 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)



    Started vacuum filling the cooling system.




    Preparing for the fire up.
    After wearing the ear plugs in case the security alarm triggered, re-connected the
    battery that was on battery conditioner from the start
    ...
  2. Eng Refresh Stage 1 - 15

    by , 22-03-2012 at 10:31 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)



    Not much to report while re-assembling everything back in place as it’s just a
    matter of lots and lots of wrenching.



    New header tank, cap and fuel lines installed.




    Vacuum leak check
    ...
  3. Another year has gone by

    by , 21-03-2012 at 01:01 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)
  4. Eng Refresh Stage 1 - 14

    by , 20-03-2012 at 10:12 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)



    Replaced three coolant hoses at the centre floor tunnel.




    All coolant hoses at the front compartment were replaced so now I can
    focus on the engine/Gbox installation.



    ...
  5. Eng Refresh Stage 1 - 13

    by , 19-03-2012 at 10:19 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)




    Finished the valve clearance adjustment at the front bank.
    Double checked the clearance and the torque.




    Applied silicone grease at the metal plate of IG coil as well as the insulator tube
    where it
    ...