View RSS Feed

Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer

Updates from Kaz-kzukNA1

  1. Eng Refresh 12

    by , 12-01-2014 at 11:33 AM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)




    New CRK/CYL sensor installed and carefully torqued the fixing bolts.






    All four cam shafts
    ...
  2. Oil Leakage 04

    by , 14-12-2013 at 01:31 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)








    TB installed in the original orientation and tensioned properly.
    I wish I have three hands just for this procedure.........

    By the way, I did notice that the timing marking at the back of the
    rear
    ...
  3. Oil Leakage 03

    by , 14-12-2013 at 12:48 AM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)


    Started to remove the valve cover.

    I was hoping that the leakage was from the corner of the valve cover gasket
    above the #1 cam holder so that I don’t need to remove the cam shaft.


    Unfortunately, it was not the case and the valve cover gasket was
    really stuck on the cyl head and cam holder surfaces that I had to pull it off
    ...
  4. Eng Refresh Stage 1 – 12

    by , 14-04-2013 at 10:37 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)



    Started the re-assembly process.








    New O-ring under the #1 cam holder at each bank.












    ...
  5. Eng Refresh Stage 2 – 09

    by , 23-12-2012 at 10:35 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)




    The weather condition was kind to me today and
    with the support from the garage heater,
    there was no more high humidity in the air and
    was happy to start the cam shaft installation.









    New O-ring under No.1 cam holder.







    ...
Page 3 of 4 FirstFirst 1234 LastLast