View RSS Feed

Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer

Updates from Kaz-kzukNA1

  1. Eng Refresh Stage 1 + LMA 08

    by , 23-08-2012 at 10:54 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)







    VTEC spool valve and oil pressure sender unit removed.

    Noticed that one of the bolt holding the upper section of the solenoid to
    the valve body was replaced with non-OEM one so may be someone
    replaced the filter in the past.

    Later, I found the bolt inside the pocket of front engine mount.

    Because the bottom side of the bolt is exposed to the outside air,
    quite often, the bolt can get
    ...

    Updated 24-09-2012 at 10:01 AM by Kaz-kzukNA1 (Revised blog category.)

    Categories
    Eng Refresh Stage 1 + LMA
  2. Eng Refresh Stage 1 - 09

    by , 23-05-2012 at 10:33 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)





    Despite all these poor previous service works, I’m very impressed with the cleanness of the internal engine parts on this engine.




    Probably, one the most clean engine in UK.










    ...
  3. Eng Refresh Stage 2 - 09

    by , 23-01-2012 at 10:40 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)



    On going project of cleaning the engine….




    EGR valve cleaned.
    Didn’t want to disturb the spindle so only briefly cleaned around it and cleaned the port while opening the valve manually.
    The EGR tube and small chamber were also soaked in special cleaning solution and ready for the reassembly.

    ...

    Updated 01-06-2012 at 10:18 PM by Kaz-kzukNA1

    Tags: egr, lma Add / Edit Tags
    Categories
    Engine Refresh Stage 2
  4. Eng Refresh Stage 2 - 08

    by , 21-01-2012 at 10:32 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)


    You guessed it right…. I’m still cleaning the parts….
    I think I’m obsessed in cleaning the parts….
    Really hate peeling off the melted potting from the timing sensor.

    It’s just everywhere and there is no easy solution for this so you just need to keeping scraping it off by hand.

    Got bored so decided to work on the easy bits.







    ...

    Updated 01-06-2012 at 10:09 PM by Kaz-kzukNA1

    Tags: lma, rocker shaft Add / Edit Tags
    Categories
    Engine Refresh Stage 2
  5. Eng Refresh Stage 2 – 07

    by , 20-01-2012 at 10:37 PM (Today at Atelier Kaz - ex-Honda R&D, F1, Indy/CART engineer)


    As expected, some of the valve clearance was at the limit or just out of the spec so it would be interesting to see how the deviation of the compression check between the cyl will improve after this service.


    Happy with the initial engine inspection stage so from here, I just keep removing the parts so that I can clean the inside of the engine.






    ...

    Updated 01-06-2012 at 10:02 PM by Kaz-kzukNA1

    Tags: lma, lost motion Add / Edit Tags
    Categories
    Engine Refresh Stage 2
Page 10 of 10 FirstFirst ... 8910